WHAT’S PROPOSED FOR WUNDERLICH
PROP A
SAFETY & SECURITY
- Expansion of electronic door access and security monitoring
- Build secured vestibule at front entry
- Cybersecurity improvements to existing network infrastructure
- Build secured vestibule at front entry
- Replace school intercom system
- Replace school intercom/PA system
CONSTRUCTION
- Comprehensive interior transformation of classroom spaces to provide flexibility and natural light
- Enclose breezeway to connect cafeteria to the main building
RENOVATION
- Replace gym bleachers
- Renovate front entrance, clinic, and welcome area
- Replace school exterior weatherproofing
- Retrofit water fountains with bottle fillers
EQUIPMENT
- Acquisition and replacement of musical instruments
- Acquisition and replacement of building cooling/heating system
PROP B
PROVIDE CLASSROOM TECHNOLOGY
- New student and teacher devices
- New classroom instructional technology
PROP C
BUILD DISTRICT EVENTS CENTER
- Construction of a new district events center to feature academics, fine arts, athletics, career and technical education programs, graduation ceremonies, and large community events and gatherings
- Building site located on existing Klein ISD-owned land at 7500 FM 2920 adjacent to KMPC
- Indoor seating for over 8,000
PROP D
BUILD NEW DISTRICTWIDE STADIUM
- Construction of a new districtwide stadium located on existing Klein ISD-owned land at 7500 FM 2920 adjacent to KMPC
- Outdoor seating for over 8,000
RENOVATE KLEIN MEMORIAL STADIUM
- Bring the 55-year-old Klein Memorial Stadium (built in 1967) up to current standards
Klein ISD taxes are frozen for homeowners 65+ who have properly filed with the Harris County Tax Office. Approval of this bond would not result in an increase above the frozen amount.
7200 Spring Cypress Road
Klein, TX 77379