Select Page

WHAT’S PROPOSED FOR KLEIN OAK

PROP A

SAFETY & SECURITY

  • Acquisition and replacement of existing security system components
  • Expansion of electronic door access
  • Cybersecurity improvements to existing network infrastructure
  • Acquisition and replacement of interior door hardware
  • Build secured vestibule at front entry

CONSTRUCTION

  • Enclose open walkway to connect auditorium to main building
  • Classroom additions

RENOVATION

  • Clinic renovations
  • Field improvements
  • Retrofit water fountains with bottle fillers
  • Replace competition gym floor and bleachers
  • Replace practice gym bleachers

EQUIPMENT

  • Acquisition and replacement of Career & Technical Education equipment
  • Acquisition and replacement of building cooling/heating system, plumbing, and electrical components
  • Acquisition and replacement of musical instruments

PROP B

PROVIDE CLASSROOM TECHNOLOGY

  • New student and teacher devices
  • New classroom instructional technology

PROP C

BUILD DISTRICT EVENTS CENTER

  • Construction of a new district events center to feature academics, fine arts, athletics, career and technical education programs, graduation ceremonies, and large community events and gatherings
  • Building site located on existing Klein ISD-owned land at 7500 FM 2920 adjacent to KMPC
  • Indoor seating for over 8,000

PROP D

BUILD NEW DISTRICTWIDE STADIUM

  • Construction of a new districtwide stadium located on existing Klein ISD-owned land at 7500 FM 2920 adjacent to KMPC
  • Outdoor seating for over 8,000

RENOVATE KLEIN MEMORIAL STADIUM

  • Bring the 55-year-old Klein Memorial Stadium (built in 1967) up to current standards

Klein ISD taxes are frozen for homeowners 65+ who have properly filed with the Harris County Tax Office. Approval of this bond would not result in an increase above the frozen amount.