Select Page

WHAT’S PROPOSED FOR EILAND

PROP A

SAFETY & SECURITY

  • Expansion of electronic door access
  • Acquisition and replacement of existing security system components
  • Cybersecurity improvements to existing network infrastructure
  • Replace exterior building light fixtures
  • Replace parking lot overhead lighting
  • Replace intercom system
  • Replace fire alarm

CONSTRUCTION

  • Build new arrival and dismissal covered walkway

RENOVATION

  • Replace school exterior weatherproofing
  • Replace exterior door
  • Replace gym flooring
  • Replace baseball field backstops
  • Retrofit water fountains with bottle fillers
  • Renovate existing classrooms into a Pre-K program
  • Build 2nd-floor glass wall separation at library

EQUIPMENT

  • Upgrade commercial air conditioning and heating systems

    PROP B

    PROVIDE CLASSROOM TECHNOLOGY

    • New student and teacher devices
    • New classroom instructional technology

    PROP C

    BUILD DISTRICT EVENTS CENTER

    • Construction of a new district events center to feature academics, fine arts, athletics, career and technical education programs, graduation ceremonies, and large community events and gatherings
    • Building site located on existing Klein ISD-owned land at 7500 FM 2920 adjacent to KMPC
    • Indoor seating for over 8,000

    PROP D

    BUILD NEW DISTRICTWIDE STADIUM

    • Construction of a new districtwide stadium located on existing Klein ISD-owned land at 7500 FM 2920 adjacent to KMPC
    • Outdoor seating for over 8,000

    RENOVATE KLEIN MEMORIAL STADIUM

    • Bring the 55-year-old Klein Memorial Stadium (built in 1967) up to current standards

    Klein ISD taxes are frozen for homeowners 65+ who have properly filed with the Harris County Tax Office. Approval of this bond would not result in an increase above the frozen amount.